Category Archives: Filming Process

Digi-Pak design – Magazine Advert

Below is a PowerPoint showing our final design for a magazine advert for our album, this together with our album artwork completes our digi-pak. This advert (as explained within the PowerPoint below) includes a version of the image used for our front cover of … Continue reading

Posted in All Filming Posts, Digi-Pak, Filming Process | Leave a comment

Album Art: Final Design

The final designs for our album art are shown within the PowerPoint below, it shows our artwork designs for each of the 4 panels which make up our album art. These designs are significantly different to our preliminary designs, however … Continue reading

Posted in Album Artwork, All Filming Posts, All Research and Planning Posts, Digi-Pak, Filming Process, Research and Planning | Leave a comment

Filming Schedule – Part 2

To complete our filming schedule we have produced the second part, reflecting back upon what we intended to film and showing in a new column “What Happened” allowing us to give details on the events of the filming sessions, such … Continue reading

Posted in All Filming Posts, Filming Process | Leave a comment

Fiming Session: Queensgate (Rescheduled) – Podcast

The podcast below is our final filming session podcast, this was recorded this morning: Sunday October 20th, this podcast was recorded just before filming at 9:50am. Notably this session was not on the original filming schedule as we had to re-work our … Continue reading

Posted in All Filming Posts, Filming Process, Filming Sessions, Podcasts | Leave a comment

Filming Session: Queensgate and Maxey – Podcast

Here is our second podcast recorded today, October 13th at 9:45am, before our second filming session. This filming session took place within two locations, Queensgate and Maxey (as mentioned within our location posts and filming schedule – Part 1) The details … Continue reading

Posted in All Filming Posts, Filming Process, Filming Sessions, Podcasts | Leave a comment

Filming Session: Drama Studio – Podcast

As shown within our filming schedule (part 1), today: October 11th. We had our first filming session in the Drama Studio at Arthur Mellows Village College. Below is a podcast which we recorded prior to filming, at 10:30am this morning, … Continue reading

Posted in All Filming Posts, Filming Process, Filming Sessions, Podcasts | Leave a comment

Filming – Risk Assessment

Before we begin filming as a group we have performed a risk assessment. This assessment is to ensure safety whilst filming and to also consider the potentially dangerous aspects of our location choices, such as the embankment in Peterborough due … Continue reading

Posted in All Filming Posts, Filming Process | Leave a comment

Filming Schedule – Part 1

Prior to filming as a group we have created a filming schedule in order to structure out filming sessions and ensure that the equipment that we require for filming is available and obtained in time. For example permission to film … Continue reading

Posted in All Filming Posts, Filming Process | Leave a comment

Final Story Board

Since further planning into our music video has been undertaken, and we are approaching a stage where we are likely to begin filming shortly, we have decided to create a ‘Final Storyboard’ in order to show our most recent ideas … Continue reading

Posted in All Filming Posts, All Research and Planning Posts, Filming Process, Research and Planning, Story Board | Leave a comment

Costume and Props: The Mugger And Harlot – Desings and Choices

The other remaining characters which we have had to design costumes for are the Mugger and Harlot. These characters costumes will play upon stereotypes and colour themes used within the protagonists costumes, creating a common link between the costume designs. … Continue reading

Posted in All Filming Posts, Costume And Casting Choices, Filming Process | Leave a comment